The P-82 FPSO will be one of the largest vessels to be deployed in the Búzios field, an ultra-deepwater oil and gas field covering an area of 853 square kilometers in the Santos Basin, around 180 kilometers off the coast of Rio de Janeiro, Brazil.
ABB is supplying both the topside and hullside electrical systems for P-82, providing seamless project integration. The topside systems will be installed in an ABB eHouse solution – a prefabricated, modular substation that reduces costs, risk exposure and on-site work because all components are wired, tested and commissioned before shipment to the yard.
Once operational, the facility – which receives fluids from a subsea reservoir before separating them into crude oil, natural gas and water within topside facilities onboard – will have the capacity to produce 225,000 barrels of oil per day and process 12 million cubic meters of gas per day.
“We are delighted to be collaborating with Sembcorp Marine to deliver this integrated solution order,” said Brandon Spencer, President of ABB Energy Industries.